• Home
  • About Us
  • News Center
  • Products
  • Our Cash
  • Download
  • Solution
  • log in
  • Sign in
  • Chinese
  • Solutions
  • 1、Scattered the system structure caused more complex system of physical breakdown node increased, and later to maintenance and low efficiency
  • 2、Cannot access network video signal and unable to access the network video monitoring platform across the region
  • 3、Many types of video signal switching on the wall must be different video matrix, the system complexity is high, maintenance is poorer
  • 4、Bigscreen joining together control and image of the source control is divided into two steps to complete, in operation and management steps red tape
  • 5、Can break through the traditional "matrix stacked + graphics joining together processor" of the many steps operation on the wall display mode
  • 6、How to construct a high-definition security age really digital hd on the wall shows and application system? At the same time support traditional simulation and various digital and network hd image of access

The company address :Beijing's haidian district shangdi three street 9 the building
of JiaHua B-1012 Contact phone number :010-62974424;62971824;62964341;
Copyright 2008 - 2012 www.lw-fiber.com All rights reserved.京ICP备05077099号-1